Home   |  Message Board   |  Information   |  Leader Board   |  Classifieds   |  Features   |  Video
Duluth Area construction - Walleye Message Central
Walleye Message Central

Go Back   Walleye Message Central > Canada Eh? > Canada

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 08-01-2012, 03:21 PM
downriverbob downriverbob is offline
Charter Member
 
Join Date: Jun 2002
Location: Downriver, Michigan, USA.
Posts: 751
Default Duluth Area construction

Hey all,

We usually go through Duluth the following way: US 2 from Wisconsin on the US 2 Bong bridge to 33
and then to 53 north. Any problems or construction ?

Thanks,
BOB
__________________
“Many of us would probably be better fishermen if we did not spend so much time watching and waiting for the world to become perfect”

Norman Maclean
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may post new threads
You may post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 02:18 PM.