Home   |  Message Board   |  Information   |  Classifieds   |  Features   |  Video  |  Boat Reviews  |  Boat DIY
How many hours for rigging - Walleye Message Central
Walleye Message Central

Go Back   Walleye Message Central > Boats, Motors, Electronics and Trailers > Boats

Reply
 
Thread Tools Display Modes
  #1  
Old 09-16-2008, 07:16 AM
mcdee mcdee is offline
Keeper
 
Join Date: Dec 2006
Location: .
Posts: 276
Default How many hours for rigging

how many hours labour for taking a tiller 60 hp motor off a boat and installing it onto a new boat wiring and set up plus swaping boats from one trailer to another which includes adjusting rollers, ect ? Plus trolling motor connections ? The Dealer said 3 to 5 hours ? This is a new 1775 classic Lund Tiller new and the 1996 Pro Angler 17' has a hole in hull that was wrote off.
Reply With Quote
Sponsored Links
Advertisement
 
  #2  
Old 09-16-2008, 07:36 AM
REW REW is offline
Charter Member
 
Join Date: Nov 1999
Location: .
Posts: 40,181
Default

3-5 hours is a decent typical number.

If you want to do it yourself, and if you want to take special care and so a bunch of "special things." then you might want to allocate 3-5 days to the job or 3-5 weeks, or even 3-5 years.
It just depends on how dilligent you want to be, and how much care you want to exercise.

To unbolt a motor from a boat and bolt it on a different hull, with good lifts etc. it should take about 10 minutes.
To adjust the rollers on a trailer that is about the right size for the boat should take another 10 minutes.

--------------
Having said that, and also knowing all of the problems that always seem to crop up in rigging a boat, I would dedicate at least a 1/2 - 1 day to fully rig a boat and get it working the way that I wanted. This would be with good tools and good knowledge of what you were doing.

So, I would say that the 3-5 hours is about right for most situations.
It might be less or it might be more, but it is certainly a good starting point. The key thing in a rigging is to do it right - no matter the time involved in getting it done right. Nothing worse than sloppy rigging when you get on the water and start having problem and having to fix the results of the sloppy rigging.

Take care
REW
Reply With Quote
  #3  
Old 09-16-2008, 03:33 PM
T Mac T Mac is offline
Wallhanger
 
Join Date: May 2004
Location: Broadwater County, Montana.
Posts: 10,135
Default

[QUOTE=mcdee;1055496]how many hours labour for taking a tiller 60 hp motor off a boat and installing it onto a new boat wiring and set up plus swaping boats from one trailer to another which includes adjusting rollers, ect ? Plus trolling motor connections ? The Dealer said 3 to 5 hours ?
QUOTE]

They quoted you lower than I would have..
Reply With Quote
Sponsored Links
Advertisement
 
  #4  
Old 09-16-2008, 03:50 PM
Hot Runr Guy Hot Runr Guy is offline
Charter Member
 
Join Date: Nov 2006
Location: West Chicago, IL, USA.
Posts: 16,183
Default

[QUOTE=T Mac;1055610]
Quote:
Originally Posted by mcdee View Post
how many hours labour for taking a tiller 60 hp motor off a boat and installing it onto a new boat wiring and set up plus swaping boats from one trailer to another which includes adjusting rollers, ect ? Plus trolling motor connections ? The Dealer said 3 to 5 hours ?
QUOTE]

They quoted you lower than I would have..
That's 'cause you retired guys have to allow time to find the bolts that you took out and put down, but can't remember where. Then there's coffee w/the other geezers, afternoon naps, scratching your head because the motor is hanging from the hoist, but the hulls have to be lifted off the trailer and swapped somehow,,,,,,, Oh, heck, you get the idea

Can you tell we missed you at Winnie T Mac?
HRG
Reply With Quote
  #5  
Old 09-16-2008, 05:23 PM
T Mac T Mac is offline
Wallhanger
 
Join Date: May 2004
Location: Broadwater County, Montana.
Posts: 10,135
Default

[QUOTE=Hot Runr Guy;1055618]
Quote:
Originally Posted by T Mac View Post

That's 'cause you retired guys have to allow time to find the bolts that you took out and put down, but can't remember where. Then there's coffee w/the other geezers, afternoon naps, scratching your head because the motor is hanging from the hoist, but the hulls have to be lifted off the trailer and swapped somehow,,,,,,, Oh, heck, you get the idea

Can you tell we missed you at Winnie T Mac?
HRG
Yeah..yeah.
Missed like a boil in an armpit.


But seriously.... experience is why I would figure longer.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 02:25 AM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.